The Kitchen Refresh of 2015
WEEK SEVEN
Countertop has been set in place, with stainless sink, and range hood.
All door handles are installed. A new oven cabinet replaces original that included a slight defect.
WEEK SIX
All the cabinetry has been installed in place.
Except oven cabinet that is being replaced due to an annoying defect
Ready for counter top installation.
New sliding door has been installed.
Tough, tight fit with awning at the top.
The butcher block has been refurbished and replaced,
perhaps the sole item that will remain from old kitchen.
WEEK FOUR
Lower, counter top cabinets are set in place, preparing for countertop templating.
Ceilings and some walls painted.
WEEK THREE
LED can lights, and switches and plugs relocated and installed.
New sheetrock is installed, taped and textured.
Now it has to dry.
WEEK TWO
Old cabinetry hauled away and recycled.
Plumbing work for the sink and dishwasher
WEEK ONE
Patio Full of Cabinets – Donated to Habitat
Where the sink and cooktop used to be.
On the left was the double oven, on the right, the sink.
In the middle will be a lazy susan.
Refrigerator nook, backs up to bathroom.
Replumbed water for upstairs shower, heat ducts, new can light, rerouting wires.
All the old stuff is gone.
And so it begins……
DAY 1
Removing butcher block island, cabinets, cooktop, jennair.
Starting to reveal all that is underneath.